Location:
Mexico
Project:
Launder System Project – Taking the flow of the material from the cyclone underflow to the ball mill feeder chute.
Scope:
Design, engineer, manufacture, and install a system that includes a vertical chute, an ST Box reception chute, and a launder system that contains magnetic rubber with a ceramic inserts liner system that will outperform the life of the original system by at least 8 times.