• We can customize, engineer, and fabricate a Launder System to meet your operation’s specific requirements.
• These systems are used as a gravity conveyance in fluid based (wet material transfer) process circuits.
• Converting from traditional lined pipe sections to rectangular launders allows for the use of bolt-in rubber-ceramic lining systems.
• Our designs are easier to maintain and will provide much longer service life than traditional systems.
Curve Chute
Flow: 6.000 m3/h
Competitive performance: 1.5 months / 5” Thick liner
Valley Rubber, current performance: 6 months / 2” Thick liner
Competitive performance: 1.5 months / 5” Thick liner
Valley Rubber, current performance: 6 months / 2” Thick liner
![Curve Chute](https://www.valleyrubber.solutions/wp-content/uploads/2020/06/Curve-Chute.jpg)
Discharge Chutes
Flow: 6.000 m3/h - 7.000 m3/h
Competitive performance: Pipeline 32” / 1.5 months
Valley Rubber, current performance: 6 months / 3” Thick liner
Competitive performance: Pipeline 32” / 1.5 months
Valley Rubber, current performance: 6 months / 3” Thick liner
![Discharge Cutes](https://www.valleyrubber.solutions/wp-content/uploads/2020/06/Discharge-Cutes.jpg)
Horizontal Chutes
Flow: 6.000 m3/h
Competitive performance: 4 months / 4” Thick liner
Valley Rubber, current performance: 12 months / 3” Thick liner
Competitive performance: 4 months / 4” Thick liner
Valley Rubber, current performance: 12 months / 3” Thick liner
![Horizonal Chutes Before and After](https://www.valleyrubber.solutions/wp-content/uploads/2020/06/Horizonal-Chutes-Before-and-After.jpg)
ST Boxes
ST Boxes are used to help reduce the dynamic fluid energy in a gravity fed launder or pressurized fluid system. The box momentarily traps the fluids, creating turbulence to slow the material and dissipate some of the energy. With a rectangular design these boxes are easily fitting with a long-lasting and easy to replace rubber-ceramic lining system.
Flow: 6.000 - 7.000 m3/h
Competitive performance: 4 months / 5” Thick liner
Valley Rubber, current performance: 8 to 12 months / 4” Thick liner
Flow: 6.000 - 7.000 m3/h
Competitive performance: 4 months / 5” Thick liner
Valley Rubber, current performance: 8 to 12 months / 4” Thick liner
![ST Box](https://www.valleyrubber.solutions/wp-content/uploads/2020/06/ST-Box.jpg)
Vertical Discharge Chute
Flow: 6.000 m3/h
Competitive performance: 3 months / 5” Thick liner
Valley Rubber, current performance: 8 months / 4” Thick liner
Competitive performance: 3 months / 5” Thick liner
Valley Rubber, current performance: 8 months / 4” Thick liner
![Vertical Discharge Chute to Sump](https://www.valleyrubber.solutions/wp-content/uploads/2020/06/Vertical-Discharge-Chute-to-Sump.jpg)